NXK80 ×1500 CNC cyclone milling machine structure features:
1,The machine tool is equipped with protective cover.
2,The machine adopts integral bed, two guide rail structure, high rigidity, good wear resistance. 55° dovetail rail is adopted for bed saddle rail, which has high positioning accuracy, fast moving response and no creeping phenomenon in low speed feed .
3,Machine tool guide rail lubrication using centralized intermittent special lubrication pump lubrication, lubrication in time.
4,Feed axis [Z axis, X axis] adopts precision ball screw, driven directly by servo motor, high transmission accuracy, good positioning accuracy.
5,Feed axis [Z axis, X axis] adopts precision ball screw, driven directly by servo motor, high transmission accuracy, good positioning accuracy.
6,The milling head is driven by synchronous belt, and the milling head motor adopts frequency conversion motor7,7,Tailstock sleeve feeding mode is hydraulic feeding (pressure adjustable), convenient to disassemble the workpiece.
7,Tailstock movement adopts mechanical feed manual locking,.
8,Machine tool clamp position Clamp, located in front of milling head (removable).
9,The machine adopts wide digital system (Siemens, Fanuc system can also be configured) .
10,The machine is equipped with chip discharging machine, convenient chip discharging machine is equipped with high pressure water pump, processing through forced cooling to achieve lubrication cooling effect.
FAQ
Q1, How do I send my query?
You can contact us via email, phone, instant messaging (WhatsApp, wechat, Skype).
Q2,Is there only one model of this device?
the parameters on this page is only a model of processing small diameter screw rotor, the longest we have produced two top 8000mm, is used in the oil screw pump, metal screw pump above the rotor. Please tell me the processing diameter and length range you need, and I will match the appropriate model and technical documents for you.
Q3,If you don't know which model is suitable for your company, please tell us your requirements for the equipment, or you can send us the product drawings, and our engineers can help you choose the most suitable model for you.
Q4,delivery time
The project will be completed within 20 days after receiving the deposit. Please communicate with the sales staff about the specific construction period.
Q5,Payment Terms
30% by T/T as down payment, balance 70% by T/T before delivery. If others payment terms, we can discuss.Welcome to inquiry sales.
Q6,Can your engineers come to help us install and debug the machine?
Yes, our engineers are available to travel to your place. Round flight tickets & accommodation will be at your cost.
Q7,What control system does the equipment use
Our standard configuration is Guangzhou CNC system, fanuc and Siemens can also be used, but the price is slightly different, please contact sales for details.